I’m new and running on BOE3.0. I would like to know if the system administrator can possibly view the list of reports/objects that are scheduled based on a specific calendar that was created in CMC?
I don’t see anywhere in the CMC which allows me to do this.
Try the Excel utility located in this post https://bobj-board.org/t/118177.
You may need to modify the references for your specific version of Business Objects. It pulls down scheduling information for the reports but I don’t know if it pulls down information on calendars even though there is a spot for it because we don’t use Calendars.