Selecting Macros While Scheduling in XIR2

yes, it one of the migration biggest challenge. A lot of things are gone with the new crystal scheduler and a lot of things must be redesigned in your bca jobs. A good point to start on this subject on BOB

Good luck !!


bernard timbal :fr: (BOB member since 2003-05-26)