Scheduling multiple reports all at the same time

Hi everyone!

I have a list of webi reports that need to be scheduled all at the same time. Now I wanted them shown as a group (enlisted) so I can track the number of instances, status (successful etc.) and for an easier way to reschedule them too. Too many posts about it, it’s difficult to backread.

Thanks for the help…

Regards,


mhy_pie03 :philippines: (BOB member since 2009-02-05)


Nick Daniels :uk: (BOB member since 2002-08-15)

Thanks about that but I am not familiar with the word “package” he’s referring to. If it’s done via CMC, I do not have access to it as well.

:shock:


mhy_pie03 :philippines: (BOB member since 2009-02-05)

This might help.


Prashant Purohit :india: (BOB member since 2009-02-18)

[Moderator note - moved to XI Scheduler forum]


Nick Daniels :uk: (BOB member since 2002-08-15)