Hi All,
Is there a way to schedule the report to create both an Excel and BO copy of the output (without scheduling two separate runs)?
Please let me know.
Thanks
Rekha
rekha (BOB member since 2008-06-08)
Hi All,
Is there a way to schedule the report to create both an Excel and BO copy of the output (without scheduling two separate runs)?
Please let me know.
Thanks
Rekha
rekha (BOB member since 2008-06-08)
From Infoview, I have seen no way to schedule a report in two separate format together.
Jansi (BOB member since 2008-05-12)
I haven’t tested this before but I assume this may be possible through publication. You can go through the BO docs where it says its possible to schedule multiple formats in Publication.
forgotUN (BOB member since 2006-12-13)
Hello all… anyone tested this solution ?
Vills (BOB member since 2007-10-24)
We can schedule two instance of report with two diff formats in infoview.
VenkatSS (BOB member since 2008-07-22)
yes venkatsurendran, offcourse we can schedule two instance of report with two diff formats in infoview. i.e scheduling same report twice.
but basic question of this post trail is,
Vills (BOB member since 2007-10-24)
VenkatSS (BOB member since 2008-07-22)