BusinessObjects Board

Scheduling for multiple universes

I have an elaborate report built that uses data from 5 available universes. I’m looking for a way to schedule this report to run daily without me having to manually refresh each of the 5 universes individually.
The only difference in the Query Prompt’s is the ‘Date Type.’ Each Universe has a different dimension name for the date that is being pulled. Therefore, scheduling or even hitting the ‘Refresh All’ button doesn’t work currently because the system places a single ‘Date Type’ for all 5 queries.

Details:
Universe A | Adjustment Date
Universe B | Quantity Date
Universe C | Received Date
Universe D | Ready Date
Universe E | Completion Date

I use a hosted version of Business Intelligence and do not have access to the Universe Builder nor do I have access to any system event queues. Would the ability to run each of these Universe Queries require setting system events to trigger one after the other?


ShadyP (BOB member since 2015-08-13)