Schedule failed on Launch Pad

Hi All,
We have a tool called Control M which takes care of running scheduled jobs for BO.We are using BO 4.1 SP6 for scheduling BO reports. The control M tool pick up the report from repository and schedule the job for specified values for the prompts . When we were using the BO 3.1 version it used to run fine but in 4.1 whenever any report has a job to run the schedule it just prefix text “ps” to the prompt text which doesn’t matches.
If prompt text was “Enter Date” it seyup as “psEnter Date” and the report schedule fails.

Whether anyone has faced this issue before ? kindly suggest


swap_l (BOB member since 2009-04-09)