We have some reports that are run on demand by non savvy users.
When the report is Run Now, it fails because it is missing needed information.
When I do a schedule, it lets me enter parameter values.
My boss doesn’t want these users getting that in depth.
Is there a way, other than scheduling the job, to have it run on demand and ask for parameters?
Thanks
MG
gloworm (BOB member since 2012-10-09)