Reschedule report in XI3.1

Hi,

I’m trying to reschedule a Crystal Report, the file is written to the File System and that location is changing. I really don’t want to have create a whole bunch of new schedules by hand so I was hoping to reschedule the reports. I’ve looked in the InfoView but in XI3.1 I don’t see the reschedule option that was there in XI2. Has the rescheduling capability been removed? If not, has it been moved to a new location, maybe to the CMC? If anyone knows how to reschedule a report, and thus replace the initial report, please let me know. Thank you so much.

-NifflerX

–EDIT
I think I found it:

  From in the InfoView, the History section, the arrow to the right of the Actions button there is a reschedule option.

I’ll leave this here in case there are others like me who just couldn’t find it.


NifflerX (BOB member since 2009-08-09)