we in a migration process using the Import wizard. A lot of the XIR2 reports are scheduled and when imported to R3 the schedules are not migrated. Is there a way to do that or reports need to be re-scheduled manually in R3?
Thank you
ib
IBN (BOB member since 2007-05-29)
They should migrate, as long as you check off “Import all instances” on the document selection page of the Import Wizard.
Joe
joepeters
(BOB member since 2002-08-29)
Thank you - I will try again. Will let you know the results
IBN (BOB member since 2007-05-29)
Thank you Joe - re-importing reports with the option selected worked!
IBN (BOB member since 2007-05-29)