​Hi,
I want to load the data into BW target from SQL server source.
In the BW we created the data source and successfully load the data.
But If I want to delete the data in the BW and want to load it again there is no delete before loading option in the BW target table.
If I want to load the delta loads into BW systems then how can we achieve?
We have one project to load the data from non SAP source systems to BW system for EPM projects.
Thanks & Regards,
Ramana.
Ramana (BOB member since 2009-04-30)