Just want to check whether after the file has arrived and the event is triggered and the schedule runs successfully, will it continue to check even after successfull run of the report. Is there a break after file arrival before it starts polling again?
If you schedule a file based event for a particular date ,it will look for a particular file at the location and then it will run the event. If the same scheduling has been extend to over a period of time with a file based event.It will do the same for those periods.