Event Based Schedule(Trigger)

Hi All,

We have an event based schedule in SAP BO XI 3.1.It is based on two events(i.e Based on Text file which it will be created in server).Once two events are updated in server,The event will be triggered in BO.

But issue is,Once first text file is updated in server,automatically the event is triggered without the second file update in server. Because of this schedule got failed.

Can any one tell,how to trace out the event based schedules.Is there any log files or anything we can enable to trace out this issue.??? :roll_eyes:

Thanks in Advance
Nithin :+1:


Nithin1 :india: (BOB member since 2012-12-06)

You may have to create two separate events, one for each file.
Wait on for two events while scheduling…


BO_Chief :us: (BOB member since 2004-06-06)

Hi,

Thanks for the reply…

I had created two different events for that and it was working fine for a month and now frequently the schedule is happening only for a single file update.

How we can trace out where exactly the issue is happening.Is there any method to enable trace logs in CMC for these events? Or do we require any data upload logs for the same?

Thanks
Nithin.


Nithin1 :india: (BOB member since 2012-12-06)

Hi Nithin,

Could you prove the steps how you are creating events.

Thank you,
Rav


ravek (BOB member since 2006-08-03)

I would like to know the steps to create the events. Could you please share it?


rajan416 (BOB member since 2013-08-19)