Hi all,
Is there a way to modify the run of the report on different parameters?
the change that required is prior the loading of the required report?
Thanks
i82 (BOB member since 2015-03-05)
Hi all,
Is there a way to modify the run of the report on different parameters?
the change that required is prior the loading of the required report?
Thanks
i82 (BOB member since 2015-03-05)
details are insufficient.
is it an on-demand report where the prompt values can be passed while refreshing data, or a scheduled report?
haider (BOB member since 2005-07-18)
is it an on-demand report
Thanks
i82 (BOB member since 2015-03-05)
I guess you might be knowing about user prompts?
you can pass values to a prompt while refreshing report, read more on this here in semantic layer sticky post : FAQ: Designer
haider (BOB member since 2005-07-18)
[Moderator Note: Moved from About BOB to WebIntelligence XI]
Marek Chladny (BOB member since 2003-11-27)