Hi,
When you have a report with more than one DP, and each DP uses 2 contexts; how can you link the dimensions between DPs? After unlink them, the link button is always disable!
Ive a report with 4 DP, and I would like to keep linking dimensions between 2 DP and 2 DP, but I cannot just unlink and then link again
Thanks,
Schuster (BOB member since 2002-08-29)